If you’re working with a landscape contractor or general builder, handing over a clean spec packet up front saves a week of back-and-forth.
The eight items we ask for: dimensioned site plan with the proposed pit location, gas line capacity at the meter, distance from the nearest gas tap to the pit, finished elevation of the surrounding patio, drainage path away from the pit, electrical for an optional ignition system, distance to combustibles (overhang, fence, structures), and the local code official’s name. That last one matters — different jurisdictions interpret the same code clauses differently.
We can sign off on the install drawings before they go to the city, which gets the permit through faster. Get in touch with the trade desk if you’re working on a project that needs that kind of support.