Notice Regarding Concrete Fire Tables and Lead Times
Highly variable and often lengthy lead times on all concrete fire tables
NOTICE - September 2026
The concrete (GFRC) tables offered on our site come from an outside vendor. Right now they're shipping anywhere from one month to 90+ days out, so we can't guarantee ship dates. If you order one, we'll let you know as soon as it ships. We just don't control that timeline.
Our Venture Series is different. We build these steel, aluminum, and corten tables by hand in Missoula, Montana, and ship them ourselves. They're a stronger, longer-lasting material, ship on time, and we stand behind every ship date.
Our Venture Series is different. We build these steel, aluminum, and corten tables by hand in Missoula, Montana, and ship them ourselves. They're a stronger, longer-lasting material, ship on time, and we stand behind every ship date.
Questions? Contact Us
Here is an intro
Contact Information
-
Our Location
-
Call Us
(833) 228-5244